Summary0001768: [SWAN] [MP] 2023.06 Mass production inspection report
Description[SWAN] [MP] 2023.06 Mass production inspection report
TagsNo tags attached.
Attach Tags

Relationships

related to 0001745 closed(ALTech) SH Son [SWAN] Mass production inspection Report 

Users monitoring this issue

Activities

(ALTech) SH Son

2023-07-28 12:52

developer   ~0013754

HI An and Tony

Here is inspection report of BFX-UA300 last month.

Critical
• No sound output * 1pcs
Major
• NTF issues related Button * 2pcs
• Poor paint finish * 5pcs

• End user defect
• Major : BTV logo plate missing * 1pcs
Please find the attachment file, and Please let me know if you need a defect sample for analysis


Thanks
SON

(ALTech) SH Son

2023-08-07 09:17

developer   ~0013826

HI Rachel and An

Please update the analysis report


Thanks
SON

(MFG) Rachel Ruan

2023-08-10 17:33

developer   ~0013869

Dear SH Son

Fii update analysis report:

Critical
• No sound output * 1pcs -> Analysis result is NTF.
Major
• NTF issues related Button * 2pcs -> Measure impedance FFC cable found out signal button Power ON, CH-,Ch+ open 9,35Kom
• Poor paint finish * 5pcs -> Provide the preventive action.

• End user defect
• Major : BTV logo plate missing * 1pcs -> We keep monitoring on FATP for BTV logo missing issue
Please help review FA report.

Many thanks
Rachel Ruan

(ALTech) SH Son

2023-08-21 09:55

developer   ~0013918

Hi Rachel,

thank you for update, please update the due date from vender report.

Major
• NTF issues related Button * 2pcs -> Measure impedance FFC cable found out signal button Power ON, CH-,Ch+ open 9,35Kom


Thanks
SON

(MFG) Rachel Ruan

2023-08-22 17:16

developer   ~0013944

Dear SH Son

Fii update analysis report:

Major
• NTF issues related Button * 2pcs -> Measure impedance FFC cable found out signal button Power ON, CH-,Ch+ open 9,35Kom
=> Update P-Two FA report: ( Att file )

1. Root Cause:
At the A end of the conductor, the reinforcement plate is bent and the conductor is warped and broken. Suggestion may be operation doing wrong method make the conductor to break , resulting in poor operation.

2. Corrective Action:
2.1 : Electrical inspection in P-TWO can 100% detect defective products, it can effectively prevent conductor warping and conductor breakage.
2.2: Fii-FATP can cover 100% button function issue by testing ( FT1 test station check all button function ).
2.3: Fii keep monitoring on FATP for assembly FFC cable issue.

Please help review FA report.

Many Thanks
Rachel

Issue History

Date Modified Username Field Change
2023-07-18 08:53 (ALTech) SH Son New Issue
2023-07-18 08:53 (ALTech) SH Son Relationship added related to 0001745
2023-07-24 11:29 (SW) Jacky Chiang Severity s2-severe => s4-minor
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (MFG) Ben Trinh
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (MFG) Rachel Ruan
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (MFG) Toney Tu
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (PM) Roisy Liang
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2023-07-28 12:52 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2023-07-28 12:52 (ALTech) SH Son Note Added: 0013754
2023-07-28 12:52 (ALTech) SH Son File Added: [SWAN] 2023.06 mass production inspection_rev01.pdf
2023-08-07 09:14 (ALTech) SH Son Assigned To => (MFG) Rachel Ruan
2023-08-07 09:14 (ALTech) SH Son Status new => assigned
2023-08-07 09:17 (ALTech) SH Son Note Added: 0013826
2023-08-10 17:33 (MFG) Rachel Ruan Note Added: 0013869
2023-08-10 17:33 (MFG) Rachel Ruan File Added: BFX-UA300 2023.06 Production Inspection Fail.Ver0.pptx
2023-08-21 09:55 (ALTech) SH Son Note Added: 0013918
2023-08-22 17:16 (MFG) Rachel Ruan Note Added: 0013944
2023-08-22 17:16 (MFG) Rachel Ruan File Added: BFX-UA300 2023.06 Production Inspection Fail.Ver1.pptx
2023-08-22 17:16 (MFG) Rachel Ruan File Added: Ver 02 Foxconn 183005-15100-1 not work power button STB analysis report 2023082....ppt.ppt
2025-04-07 10:09 (PM) Sheila Tu Status assigned => closed